Author(s):
Correia, Bárbara ; Matos, Henrique A. ; Lopes, Tiago ; Marques, Susana ; Gírio, Francisco
Date: 2024
Persistent ID: http://hdl.handle.net/10400.9/4385
Origin: Repositório do LNEG
Subject(s): Bioethanol; Production; Lignocellulosic biomass; Economic analysis; Life cycle assessment
Description
Error in Table: In the original publication [1], there was a mistake in Table 8 as published. The presented cost of purchased equipment and Total CAPEX cost shall not differ between the two scenarios. The purchased equipment cost and Total CAPEX cost should be, for both scenarios, 21.35 and 75.66M€, respectively. The corrected Table 8 appears below. The authors state that the scientific conclusions are unaffected. This correction was approved by the Academic Editor. The original publication has also been updated.