Description

Este trabalho centra-se numa sugestão de conversão de uma pedreira de rocha industrial uma pedreira de rocha ornamental, inserida no maciço rochoso de Arronches. Para isso é necessário proceder ao estudo do maciço rochoso, o qual foi realizado em três etapas: o trabalho de campo, os ensaios laboratoriais e o trabalho de gabinete. No trabalho de campo foram aplicadas técnicas de recolha de dados como a amostragem linear, foi utilizado o martelo de Schmidt e foram realizadas seis sondagens. Quanto aos ensaios laboratoriais foram realizados o ensaio de Los Angeles, micro‐Deval e o ensaio petrográfico, entre outros. No trabalho de gabinete foi analisada a informação disponível de modo a perceber se o maciço em estudo é indicado para a exploração de rocha ornamental. Posteriormente à avaliação da qualidade do maciço, a qual se revelou com aptidão para a exploração da rocha ornamental procedeu‐se ao estudo estrutural do maciço. Neste estudo foram analisadas as descontinuidades do maciço, estas foram organizadas em famílias e finalmente procedeu‐se à elaboração do bloco unitário. Na fase final deste trabalho foi sugerido um plano de lavra para a pedreira de rocha industrial. No plano de lavra foi definido o sentido de desmonte, foram definidas as bancadas, escolhido o método de desmonte e calculados os tempos de desmonte e todos os recursos necessários desde o destaque do bloco principal até se obter o bloco de dimensões comerciais.

This work focuses on a suggestion of conversion of an industrial rock quarry into an ornamental quarry, located in rock mass of Arronches. For this it is necessary to proceed to the study of the rocky mass, as weel as the study of the rock mass was carried out in three stages: the field work, the laboratory tests and the desk studies. In the field work data collection techniques such scanline smapling technique was applied, the Schmidt hammer was performed and six probs were performed. As for laboratory tests, the Los Angeles, micro‐Deval test and the petrographic test were performed, among others. In the desk studies the available information was analyzed in order to suitable study the rock mass for the exploitation of ornamental stone. After the confirmation that the rock mass is suitability for the ornamental exploitation, the structural study of the rock mass was carried out. In this study, the discontinuities of the rock mass were analyzed, these were organized in family sets and finally the block size was elaborated. In the final phase of this work, an exploitation plan for the industrial rock quarry was suggested. In the exploitation plan the direction of exploration was defined, the number of benches were defined, the exploration method was chosen, and the cutting times and all the necessary resources were calculated from the cutting of the main block size until the block of commercial dimensions was obtained.

Document Type Master thesis
Language Portuguese
Advisor(s) Fernandes, José Augusto Abreu Peixoto