Document details

Solution methods for an integrated lot sizing and scheduling problem

Author(s): Pimentel, Carina ; Alvelos, Filipe ; Carvalho, J.M. Valério de ; Duarte, António

Date: 2009

Persistent ID: http://hdl.handle.net/10198/7305

Origin: Biblioteca Digital da UPB


Description

In this talk we present results of an ongoing study, based on a problem of a textile factory. The core problem is an integrated lotsizing and scheduling one, characterized by sets of parallel machines, arbitrary demands and due dates for products, a compatibility matrix between machines and components and release dates of machines. In a solution, the quantities to produce by product/component/size are split among smaller lots, the machines in which those lots will be produced are determined, as well as the order in which they will be done. We present a MIP model and results of a VNS heuristic.

Document Type Conference object
Language English
Contributor(s) Biblioteca Digital da UPB
facebook logo  linkedin logo  twitter logo 
mendeley logo

Related documents