Detalhes do Documento

Life-cycle cost optimization in highway concrete bridges management

Autor(es): Almeida, Joana O. ; Delgado, Raimundo M. ; Teixeira, Paulo F.

Data: 2012

Identificador Persistente: http://hdl.handle.net/20.500.11960/3512

Origem: Repositório Científico IPVC

Assunto(s): Bridge management; Life-cycle cost; Genetic algorithms optimization; Markov matrices; Monte Carlo analysis


Descrição

A methodology for life cycle cost minimization on a set of highway concrete bridges during a medium/long term period of time is presented in order to help on structures management decision process. This methodology takes into consideration the direct and indirect costs associated to different kinds of interventions during bridges lifetime, uses some Markov Matrices as degradation model and applies a genetic algorithm to identify the optimized intervention plan, considering the available budget and the desired minimum performance level. Data’s uncertainty is treated in a probabilistic way and Monte Carlo Method simulation is used to highlight the most important parameters on the optimized solution identification.

Tipo de Documento Objeto de conferência
Idioma Inglês
facebook logo  linkedin logo  twitter logo 
mendeley logo

Documentos Relacionados