Comparing AHP and ELECTRE I for prioritizing software requirements

Ver documento

Detalhes bibliográficos
Resumo:Requirement prioritization is a process that allows selection of the “key” candidate requirements, the ones that are the most important for the construction of quality and cost-controlled software. Requirement prioritization brings certain issues and challenges related with the different stakeholders involved in the project, as well as with the prioritization techniques used, which differ in procedures, criteria and metrics. This manuscript compares two multi-criteria decision methods (MCDM), AHP and ELECTRE I, seeking to justify which one is the most feasible in the requirement prioritization process of a real-world case study. To accomplish this aim, several criteria were used to compare the applicability and performance of both MCDMs. In order to reflect reality as close as possible, several stakeholders, including software professionals directly related to the case study, were involved. The results confirm the intuition that ELECTRE I is more easily applicable than AHP. ELECTRE I is subject to fewer mistakes in comparisons of the requirements than the AHP method, as these are carried out differently. In fact, due to its inherent complexity, AHP becomes even impractical in software projects with a large number of requirements.
Autores principais:Fernandes, João M.
Outros Autores:Rodrigues, Susana Prozil; Costa, L.
Assunto:Ciências Naturais::Ciências da Computação e da Informação
Ano:2015
País:Portugal
Tipo de documento:comunicação em conferência
Tipo de acesso:acesso aberto
Instituição associada:Universidade do Minho
Idioma:inglês
Origem:RepositóriUM - Universidade do Minho
Descrição
Resumo:Requirement prioritization is a process that allows selection of the “key” candidate requirements, the ones that are the most important for the construction of quality and cost-controlled software. Requirement prioritization brings certain issues and challenges related with the different stakeholders involved in the project, as well as with the prioritization techniques used, which differ in procedures, criteria and metrics. This manuscript compares two multi-criteria decision methods (MCDM), AHP and ELECTRE I, seeking to justify which one is the most feasible in the requirement prioritization process of a real-world case study. To accomplish this aim, several criteria were used to compare the applicability and performance of both MCDMs. In order to reflect reality as close as possible, several stakeholders, including software professionals directly related to the case study, were involved. The results confirm the intuition that ELECTRE I is more easily applicable than AHP. ELECTRE I is subject to fewer mistakes in comparisons of the requirements than the AHP method, as these are carried out differently. In fact, due to its inherent complexity, AHP becomes even impractical in software projects with a large number of requirements.