Document details

Demand driven material requirements planning: using the buffer status to schedule replenishment orders

Author(s): Fernandes, Nuno O. ; Guedes, Nelson ; Thürer, Matthias ; Ferreira, Luís Pinto ; Ávila, Paulo ; Silva, Sílvio do Carmo

Date: 2024

Persistent ID: http://hdl.handle.net/10400.11/9126

Origin: Repositório Científico do Instituto Politécnico de Castelo Branco

Subject(s): Production control; DDMRP; Priority scheduling


Description

Demand Driven Material Requirements Planning argues that production re-plenishment orders should be scheduled on the shop floor according to the buffers’ on-hand inventory. However, the actual performance impact of this remains largely unknown. Using discrete event simulation, this study com-pares scheduling based on the on-hand inventory, with scheduling based on the inventory net flow position. Results of our study show that scheduling based on the former performs best, particularly when multiple production orders are simultaneously generated and progress independently on the shop floor. Our finds give hints that are important to both, industrial

Document Type Conference object
Language English
Contributor(s) Repositório Científico do Instituto Politécnico de Castelo Branco
facebook logo  linkedin logo  twitter logo 
mendeley logo

Related documents

No related documents