Publicação

Application of lean principles in maintenance management: a case study

Ver documento

Detalhes bibliográficos
Resumo:This work presents the application of Lean principles in maintenance management through a case study supported by a company that provided its data and procedures for analysis. The study was conducted following the DMAIC cycle (Define, Measure, Analyze, Improve, and Control), enabling a detailed evaluation of maintenance processes, identifying failures, developing improvement actions, and controlling maintenance performance indicators. Each DMAIC phase was structured with Lean and Quality tools. In the ‘Define’ phase, the project scope, objectives, and limitations were established using a Project Charter and a SIPOC diagram, which studied 6 processes in the maintenance system. In ‘Measure’, the history of maintenance orders and performance indicators was studied. The ‘Analyze’ phase identified the causes of inefficiencies using the Ishikawa Diagram, and in ‘Improve’, an Impact x Effort matrix was developed to select the causes that should be prioritized, enabling the creation of an action plan, using the 4W1H tool, to address these causes. The ‘Control’ phase introduced the ‘Maintenance Failure Profile’, which enables the monitoring of performance indicators, tracking equipment failure modes, and assessing the maintenance team’s efficiency. This tool provides leadership with a detailed view of the maintenance status, enables historical comparisons, and supports data-driven decisions. The project demonstrates that the analysis performed, along with the proposed improvements, has the potential to significantly enhance the efficiency of this company’s maintenance management, without requiring financial investments or structural changes.
Autores principais:Abreu, Gustavo Ventura Ferreira de
Assunto:Maintenance Lean DMAIC Process improvement
Ano:2025
País:Portugal
Tipo de documento:dissertação de mestrado
Tipo de acesso:acesso aberto
Instituição associada:Instituto Politécnico de Bragança
Idioma:inglês
Origem:Biblioteca Digital do IPB
_version_ 1867173197142556672
author Abreu, Gustavo Ventura Ferreira de
author_facet Abreu, Gustavo Ventura Ferreira de
author_role author
contributor_name_str_mv Vaz, Clara B.
Silveira, Raphael Jose Elino Da
Biblioteca Digital do IPB
country_str PT
creators_json_txt [{\"Person.name\":\"Abreu, Gustavo Ventura Ferreira de\"}]
datacite.contributors.contributor.contributorName.fl_str_mv Vaz, Clara B.
Silveira, Raphael Jose Elino Da
Biblioteca Digital do IPB
datacite.creators.creator.creatorName.fl_str_mv Abreu, Gustavo Ventura Ferreira de
datacite.date.Accepted.fl_str_mv 2025-01-01T00:00:00Z
datacite.date.available.fl_str_mv 2025-11-12T12:12:33Z
datacite.date.embargoed.fl_str_mv 2025-11-12T12:12:33Z
datacite.rights.fl_str_mv http://purl.org/coar/access_right/c_abf2
datacite.subjects.subject.fl_str_mv Maintenance
Lean
DMAIC
Process improvement
datacite.titles.title.fl_str_mv Application of lean principles in maintenance management: a case study
dc.contributor.none.fl_str_mv Vaz, Clara B.
Silveira, Raphael Jose Elino Da
Biblioteca Digital do IPB
dc.creator.none.fl_str_mv Abreu, Gustavo Ventura Ferreira de
dc.date.Accepted.fl_str_mv 2025-01-01T00:00:00Z
dc.date.available.fl_str_mv 2025-11-12T12:12:33Z
dc.date.embargoed.fl_str_mv 2025-11-12T12:12:33Z
dc.format.none.fl_str_mv application/pdf
dc.identifier.none.fl_str_mv http://hdl.handle.net/10198/35049
dc.language.none.fl_str_mv eng
dc.rights.cclincense.fl_str_mv http://creativecommons.org/licenses/by/4.0/
dc.rights.none.fl_str_mv http://purl.org/coar/access_right/c_abf2
dc.subject.none.fl_str_mv Maintenance
Lean
DMAIC
Process improvement
dc.title.fl_str_mv Application of lean principles in maintenance management: a case study
dc.type.none.fl_str_mv http://purl.org/coar/resource_type/c_bdcc
description This work presents the application of Lean principles in maintenance management through a case study supported by a company that provided its data and procedures for analysis. The study was conducted following the DMAIC cycle (Define, Measure, Analyze, Improve, and Control), enabling a detailed evaluation of maintenance processes, identifying failures, developing improvement actions, and controlling maintenance performance indicators. Each DMAIC phase was structured with Lean and Quality tools. In the ‘Define’ phase, the project scope, objectives, and limitations were established using a Project Charter and a SIPOC diagram, which studied 6 processes in the maintenance system. In ‘Measure’, the history of maintenance orders and performance indicators was studied. The ‘Analyze’ phase identified the causes of inefficiencies using the Ishikawa Diagram, and in ‘Improve’, an Impact x Effort matrix was developed to select the causes that should be prioritized, enabling the creation of an action plan, using the 4W1H tool, to address these causes. The ‘Control’ phase introduced the ‘Maintenance Failure Profile’, which enables the monitoring of performance indicators, tracking equipment failure modes, and assessing the maintenance team’s efficiency. This tool provides leadership with a detailed view of the maintenance status, enables historical comparisons, and supports data-driven decisions. The project demonstrates that the analysis performed, along with the proposed improvements, has the potential to significantly enhance the efficiency of this company’s maintenance management, without requiring financial investments or structural changes.
dirty 0
eu_rights_str_mv openAccess
format masterThesis
fulltext.url.fl_str_mv https://bibliotecadigital.ipb.pt/bitstreams/dbf45c2a-2521-46be-a571-cba996973e4e/download
id ipb_0c09ee4e81d9c1face5e32ef9f8ba805
identifier.url.fl_str_mv http://hdl.handle.net/10198/35049
instacron_str ipb
institution Instituto Politécnico de Bragança
instname_str Instituto Politécnico de Bragança
language eng
network_acronym_str ipb
network_name_str Biblioteca Digital do IPB
oai_identifier_str oai:bibliotecadigital.ipb.pt:10198/35049
organization_str_mv urn:organizationAcronym:ipb
person_str_mv Abreu, Gustavo Ventura Ferreira de
publishDate 2025
reponame_str Biblioteca Digital do IPB
repository_id_str urn:repositoryAcronym:ipb
service_str_mv urn:repositoryAcronym:ipb
spelling engporThis work presents the application of Lean principles in maintenance management through a case study supported by a company that provided its data and procedures for analysis. The study was conducted following the DMAIC cycle (Define, Measure, Analyze, Improve, and Control), enabling a detailed evaluation of maintenance processes, identifying failures, developing improvement actions, and controlling maintenance performance indicators. Each DMAIC phase was structured with Lean and Quality tools. In the ‘Define’ phase, the project scope, objectives, and limitations were established using a Project Charter and a SIPOC diagram, which studied 6 processes in the maintenance system. In ‘Measure’, the history of maintenance orders and performance indicators was studied. The ‘Analyze’ phase identified the causes of inefficiencies using the Ishikawa Diagram, and in ‘Improve’, an Impact x Effort matrix was developed to select the causes that should be prioritized, enabling the creation of an action plan, using the 4W1H tool, to address these causes. The ‘Control’ phase introduced the ‘Maintenance Failure Profile’, which enables the monitoring of performance indicators, tracking equipment failure modes, and assessing the maintenance team’s efficiency. This tool provides leadership with a detailed view of the maintenance status, enables historical comparisons, and supports data-driven decisions. The project demonstrates that the analysis performed, along with the proposed improvements, has the potential to significantly enhance the efficiency of this company’s maintenance management, without requiring financial investments or structural changes.application/pdfApplication of lean principles in maintenance management: a case studyAbreu, Gustavo Ventura Ferreira deVaz, Clara B.Silveira, Raphael Jose Elino DaHostingInstitutionOrganizationalBiblioteca Digital do IPBe-mailmailto:dspace@ipb.ptdspace@ipb.ptURNurn:tid:2040480792025-11-12T12:12:33Z202520252025-01-01T00:00:00ZHandlehttp://hdl.handle.net/10198/35049http://purl.org/coar/access_right/c_abf2open accessMaintenanceLeanDMAICProcess improvement7063930 bytesliteraturehttp://purl.org/coar/resource_type/c_bdccmaster thesis2025http://creativecommons.org/licenses/by/4.0/http://purl.org/coar/access_right/c_abf2application/pdffulltexthttps://bibliotecadigital.ipb.pt/bitstreams/dbf45c2a-2521-46be-a571-cba996973e4e/download
spellingShingle Application of lean principles in maintenance management: a case study
Abreu, Gustavo Ventura Ferreira de
Maintenance
Lean
DMAIC
Process improvement
status SINGLETON
subject.fl_str_mv Maintenance
Lean
DMAIC
Process improvement
title Application of lean principles in maintenance management: a case study
title_full Application of lean principles in maintenance management: a case study
title_fullStr Application of lean principles in maintenance management: a case study
title_full_unstemmed Application of lean principles in maintenance management: a case study
title_short Application of lean principles in maintenance management: a case study
title_sort Application of lean principles in maintenance management: a case study
topic Maintenance
Lean
DMAIC
Process improvement
topic_facet Maintenance
Lean
DMAIC
Process improvement
url http://hdl.handle.net/10198/35049
visible 1