Publicação

A scheduling model for a knitting planning problem

Ver documento

Detalhes bibliográficos
Resumo:In this paper we present two planning and scheduling models for a real problem of a textile industry that produces fine knitted goods. In both of them we develop plans to assist the knitting planning of one of three knitting subsections. In this problem we intend to assign and sequence, within a set of available and identical parallel machines, the demand associated with each component or garment part. This demand can be split in lots of smaller quantities and these lots can be independently produced at any time in one or more of the available machines. In the first model we develop a mixed integer programming (MIP) formulation and in the second one we develop network flow based models and a scheduling heuristic. The main advantage of the second model, in opposition to the first one, is the small computational resources needed to solve this huge and complex problem. We solve an instance generated in accordance with the characteristics of the real problem by the second model and present some performance measures.
Autores principais:Pimentel, Carina
Outros Autores:Alvelos, Filipe; Duarte, António; Carvalho, J.M. Valério de
Assunto:Planning and scheduling Mixed integer programming Network flows
Ano:2008
País:Portugal
Tipo de documento:comunicação em conferência
Tipo de acesso:acesso aberto
Instituição associada:Instituto Politécnico de Bragança
Idioma:inglês
Origem:Biblioteca Digital do IPB
_version_ 1867173001068281856
author Pimentel, Carina
author2 Alvelos, Filipe
Duarte, António
Carvalho, J.M. Valério de
author2_role author
author
author
author_facet Pimentel, Carina
Alvelos, Filipe
Duarte, António
Carvalho, J.M. Valério de
author_role author
contributor_name_str_mv Biblioteca Digital do IPB
country_str PT
creators_json_txt [{\"Person.name\":\"Pimentel, Carina\"},{\"Person.name\":\"Alvelos, Filipe\"},{\"Person.name\":\"Duarte, António\",\"Person.identifier.orcid\":\"0000-0003-3759-3850\"},{\"Person.name\":\"Carvalho, J.M. Valério de\"}]
datacite.contributors.contributor.contributorName.fl_str_mv Biblioteca Digital do IPB
datacite.creators.creator.creatorName.fl_str_mv Pimentel, Carina
Alvelos, Filipe
Duarte, António
Carvalho, J.M. Valério de
datacite.date.Accepted.fl_str_mv 2008-01-01T00:00:00Z
datacite.date.available.fl_str_mv 2012-07-26T09:53:42Z
datacite.date.embargoed.fl_str_mv 2012-07-26T09:53:42Z
datacite.rights.fl_str_mv http://purl.org/coar/access_right/c_abf2
datacite.subjects.subject.fl_str_mv Planning and scheduling
Mixed integer programming
Network flows
datacite.titles.title.fl_str_mv A scheduling model for a knitting planning problem
dc.contributor.none.fl_str_mv Biblioteca Digital do IPB
dc.creator.none.fl_str_mv Pimentel, Carina
Alvelos, Filipe
Duarte, António
Carvalho, J.M. Valério de
dc.date.Accepted.fl_str_mv 2008-01-01T00:00:00Z
dc.date.available.fl_str_mv 2012-07-26T09:53:42Z
dc.date.embargoed.fl_str_mv 2012-07-26T09:53:42Z
dc.format.none.fl_str_mv application/pdf
dc.identifier.none.fl_str_mv http://hdl.handle.net/10198/7322
dc.language.none.fl_str_mv eng
dc.rights.none.fl_str_mv http://purl.org/coar/access_right/c_abf2
dc.subject.none.fl_str_mv Planning and scheduling
Mixed integer programming
Network flows
dc.title.fl_str_mv A scheduling model for a knitting planning problem
dc.type.none.fl_str_mv http://purl.org/coar/resource_type/c_5794
description In this paper we present two planning and scheduling models for a real problem of a textile industry that produces fine knitted goods. In both of them we develop plans to assist the knitting planning of one of three knitting subsections. In this problem we intend to assign and sequence, within a set of available and identical parallel machines, the demand associated with each component or garment part. This demand can be split in lots of smaller quantities and these lots can be independently produced at any time in one or more of the available machines. In the first model we develop a mixed integer programming (MIP) formulation and in the second one we develop network flow based models and a scheduling heuristic. The main advantage of the second model, in opposition to the first one, is the small computational resources needed to solve this huge and complex problem. We solve an instance generated in accordance with the characteristics of the real problem by the second model and present some performance measures.
dirty 0
eu_rights_str_mv openAccess
format conferencePaper
fulltext.url.fl_str_mv https://bibliotecadigital.ipb.pt/bitstreams/bc5d9255-0449-4615-b798-c98a6b613cf2/download
id ipb_8d2ecf0ad6ba0bf3f7e1f358cfe7e9b2
identifier.url.fl_str_mv http://hdl.handle.net/10198/7322
instacron_str ipb
institution Instituto Politécnico de Bragança
instname_str Instituto Politécnico de Bragança
language eng
network_acronym_str ipb
network_name_str Biblioteca Digital do IPB
oai_identifier_str oai:bibliotecadigital.ipb.pt:10198/7322
organization_str_mv urn:organizationAcronym:ipb
person_str_mv Pimentel, Carina
Alvelos, Filipe
Duarte, António
Duarte, António
https://www.ciencia-id.pt/9C13-787B-295F
9C13-787B-295F
http://orcid.org/0000-0003-3759-3850
0000-0003-3759-3850
Carvalho, J.M. Valério de
publishDate 2008
reponame_str Biblioteca Digital do IPB
repository_id_str urn:repositoryAcronym:ipb
service_str_mv urn:repositoryAcronym:ipb
spelling engporIn this paper we present two planning and scheduling models for a real problem of a textile industry that produces fine knitted goods. In both of them we develop plans to assist the knitting planning of one of three knitting subsections. In this problem we intend to assign and sequence, within a set of available and identical parallel machines, the demand associated with each component or garment part. This demand can be split in lots of smaller quantities and these lots can be independently produced at any time in one or more of the available machines. In the first model we develop a mixed integer programming (MIP) formulation and in the second one we develop network flow based models and a scheduling heuristic. The main advantage of the second model, in opposition to the first one, is the small computational resources needed to solve this huge and complex problem. We solve an instance generated in accordance with the characteristics of the real problem by the second model and present some performance measures.application/pdfporA scheduling model for a knitting planning problemPimentel, CarinaAlvelos, FilipePersonalDuarte, AntónioDSpacehttp://dspace.org/items/40f0f385-492d-4c6c-8949-2480688b1666DSpacehttp://dspace.org/items/40f0f385-492d-4c6c-8949-2480688b1666DuarteAntónioCiência IDhttps://www.ciencia-id.pt9C13-787B-295FORCIDhttp://orcid.org0000-0003-3759-3850Researcher IDhttps://www.researcherid.comH-4473-2011Scopus Author IDhttps://www.scopus.com36967901400Carvalho, J.M. Valério deHostingInstitutionOrganizationalBiblioteca Digital do IPBe-mailmailto:dspace@ipb.ptdspace@ipb.ptISBNIsPartOf978-4-88361-646-62012-07-26T09:53:42Z20082008-01-01T00:00:00ZHandlehttp://hdl.handle.net/10198/7322http://purl.org/coar/access_right/c_abf2open accessPlanning and schedulingMixed integer programmingNetwork flows1534851 bytesother research producthttp://purl.org/coar/resource_type/c_5794conference paperhttp://purl.org/coar/access_right/c_abf2application/pdffulltexthttps://bibliotecadigital.ipb.pt/bitstreams/bc5d9255-0449-4615-b798-c98a6b613cf2/downloadPOM Tokio 2008 - 3rd World Conference on Production and Operations ManagementTokio
spellingShingle A scheduling model for a knitting planning problem
Pimentel, Carina
Planning and scheduling
Mixed integer programming
Network flows
status SINGLETON
subject.fl_str_mv Planning and scheduling
Mixed integer programming
Network flows
title A scheduling model for a knitting planning problem
title_full A scheduling model for a knitting planning problem
title_fullStr A scheduling model for a knitting planning problem
title_full_unstemmed A scheduling model for a knitting planning problem
title_short A scheduling model for a knitting planning problem
title_sort A scheduling model for a knitting planning problem
topic Planning and scheduling
Mixed integer programming
Network flows
topic_facet Planning and scheduling
Mixed integer programming
Network flows
url http://hdl.handle.net/10198/7322
visible 1