Publicação

Opportunistic Maintenance Based on CUSUM Control Charts

Ver documento

Detalhes bibliográficos
Resumo:The use of a Ship Maintenance Management System is fundamental for the good performance of equipments and the entire platform. Over the systematic maintenance, the opportunistic maintenance is a concept that aims to minimize outages and costs preventing undesirable failures. To implement this kind of maintenance statistical methodologies must be used. The Cumulative Sum charts have a very good performance applied to processes control in quality control. We proposed the use of Modified Cumulative Sum control charts to equipment maintenance.The data under study are observations of cooling water and oil temperatures from a diesel generator. In the first phase, we will apply traditional control charts, and, in the second phase, the Cumulative charts with a certain Average Run Length will be used. Then we will compare the results and extract conclusions, presenting measures for improvement.
Autores principais:Lampreia, Suzana Paula Gomes Fernando da Silva
Outros Autores:Vairinhos, Valter Martins; Lobo, Victor J. A. S.; Parreira, Rui; Requeijo, José Gomes
Ano:2016
País:Portugal
Tipo de documento:artigo
Tipo de acesso:acesso aberto
Instituição associada:Escola Naval
Idioma:inglês
Origem:Escola Naval
Descrição
Resumo:The use of a Ship Maintenance Management System is fundamental for the good performance of equipments and the entire platform. Over the systematic maintenance, the opportunistic maintenance is a concept that aims to minimize outages and costs preventing undesirable failures. To implement this kind of maintenance statistical methodologies must be used. The Cumulative Sum charts have a very good performance applied to processes control in quality control. We proposed the use of Modified Cumulative Sum control charts to equipment maintenance.The data under study are observations of cooling water and oil temperatures from a diesel generator. In the first phase, we will apply traditional control charts, and, in the second phase, the Cumulative charts with a certain Average Run Length will be used. Then we will compare the results and extract conclusions, presenting measures for improvement.