Publicação
Solution methods for an integrated lot sizing and scheduling problem
| Resumo: | In this talk we present results of an ongoing study, based on a problem of a textile factory. The core problem is an integrated lotsizing and scheduling one, characterized by sets of parallel machines, arbitrary demands and due dates for products, a compatibility matrix between machines and components and release dates of machines. In a solution, the quantities to produce by product/component/size are split among smaller lots, the machines in which those lots will be produced are determined, as well as the order in which they will be done. We present a MIP model and results of a VNS heuristic. |
|---|---|
| Autores principais: | Pimentel, Carina |
| Outros Autores: | Alvelos, Filipe; Carvalho, J.M. Valério de; Duarte, António |
| Ano: | 2009 |
| País: | Portugal |
| Tipo de documento: | documento de conferência |
| Tipo de acesso: | acesso aberto |
| Instituição associada: | Instituto Politécnico de Bragança |
| Idioma: | inglês |
| Origem: | Biblioteca Digital do IPB |
| Resumo: | In this talk we present results of an ongoing study, based on a problem of a textile factory. The core problem is an integrated lotsizing and scheduling one, characterized by sets of parallel machines, arbitrary demands and due dates for products, a compatibility matrix between machines and components and release dates of machines. In a solution, the quantities to produce by product/component/size are split among smaller lots, the machines in which those lots will be produced are determined, as well as the order in which they will be done. We present a MIP model and results of a VNS heuristic. |
|---|