Publication

Urban water infrastructure asset management plan: case study

View document

Bibliographic Details
Summary:The current paper aims the application of the Portuguese infrastructure asset management (IAM) methodology to a case study. The inevitable degradation of urban water infrastructures creates new challenges forwater utilities engineers and manager, as they need to decide which components should be rehabilitated to efficiently match the public’s demand, while still providing a qualitative and efficient service that doesn’t compromise the financial integrity of water utilities. This methodology is based on a five-step structured sequence - (i) definition of objectives assessment criteria and metrics; (ii) diagnosis; (iii) plan production; (iv) plan implementation; and (v) monitoring and revision – being structured in three distinct levels of planning and decision (i.e., strategic, tactical and operational). The IAM methodology was applied to a sixty-year-old water supply system (WSS) located in Lisbon’s metropolitan area, Portugal, mainly focused on steps (i) to (iii) and to the tactical level of planning. Results obtained are discussed and the main conclusions are presented.
Main Authors:Ferreira, Bruno
Other Authors:Carriço, Nelson
Subject:Infrastructure Asset Management Performance Planning Urban Water Infrastructures
Year:2019
Country:Portugal
Document type:article
Access type:open access
Associated institution:Instituto Politécnico de Setúbal
Language:English
Origin:Instituto Politécnico de Setúbal
Description
Summary:The current paper aims the application of the Portuguese infrastructure asset management (IAM) methodology to a case study. The inevitable degradation of urban water infrastructures creates new challenges forwater utilities engineers and manager, as they need to decide which components should be rehabilitated to efficiently match the public’s demand, while still providing a qualitative and efficient service that doesn’t compromise the financial integrity of water utilities. This methodology is based on a five-step structured sequence - (i) definition of objectives assessment criteria and metrics; (ii) diagnosis; (iii) plan production; (iv) plan implementation; and (v) monitoring and revision – being structured in three distinct levels of planning and decision (i.e., strategic, tactical and operational). The IAM methodology was applied to a sixty-year-old water supply system (WSS) located in Lisbon’s metropolitan area, Portugal, mainly focused on steps (i) to (iii) and to the tactical level of planning. Results obtained are discussed and the main conclusions are presented.