Publicação

Assessment and optimization of wind energy integration into the power systems: application to the portuguese system

Ver documento

Detalhes bibliográficos
Resumo:The increasing integration of wind energy in power systems can be responsible for the occurrence of over-generation, especially during the off-peak periods. This paper presents a dedicated methodology to identify and quantify the occurrence of this over-generation and to evaluate some of the solutions that can be adopted to mitigate this problem. The methodology is applied to the Portuguese power system, in which the wind energy is expected to represent more than 25% of the installed capacity in a near future. The results show that the pumped-hydro units will not provide enough energy storage capacity and, therefore, wind curtailments are expected to occur in the Portuguese system. Additional energy storage devices can be implemented to offset the wind energy curtailments. However, the investment analysis performed show that they are not economically viable, due to the present high capital costs involved.
Autores principais:Faias, Sérgio Miguel Redondo
Outros Autores:Sousa, Jorge A. M.; Reis, Francisco S.; Castro, R.
Assunto:Energy storage Power system modelling Unit commitment and economic dispatch Wind energy
Ano:2012
País:Portugal
Tipo de documento:artigo
Tipo de acesso:acesso restrito
Instituição associada:Instituto Politécnico de Lisboa
Idioma:inglês
Origem:Repositório Científico do Instituto Politécnico de Lisboa
Descrição
Resumo:The increasing integration of wind energy in power systems can be responsible for the occurrence of over-generation, especially during the off-peak periods. This paper presents a dedicated methodology to identify and quantify the occurrence of this over-generation and to evaluate some of the solutions that can be adopted to mitigate this problem. The methodology is applied to the Portuguese power system, in which the wind energy is expected to represent more than 25% of the installed capacity in a near future. The results show that the pumped-hydro units will not provide enough energy storage capacity and, therefore, wind curtailments are expected to occur in the Portuguese system. Additional energy storage devices can be implemented to offset the wind energy curtailments. However, the investment analysis performed show that they are not economically viable, due to the present high capital costs involved.