Publicação
Prevention in underground construction with sequential excavation method
| Resumo: | This paper aims to describe the Sequential Excavation Method, used for excava-tion in underground works, as well as the related risks and preventive measures. This method has characteristics that differentiate it from other tunnelling techniques: it uses a larger number of workers and equipment; it has a high concurrency of tasks with various workers and equip-ment quite exposed to hazards; and it uses many potentially aggressive chemicals. Firstly, it is given a broad overview of this issue. Afterwards, it will be presented the results of a survey to a sample of experienced technicians, aimed at gauging the relevance of a set of guidelines relat-ing to the design and work phases, applicable to the domestic market and prepared following technical visits to works abroad. |
|---|---|
| Autores principais: | Tender, M. |
| Outros Autores: | Couto, J. Pedro; Ferreira, T. P. |
| Assunto: | Prevention in underground construction Safety Construction Sequential Excavation Method |
| Ano: | 2015 |
| País: | Portugal |
| Tipo de documento: | comunicação em conferência |
| Tipo de acesso: | acesso restrito |
| Instituição associada: | Universidade do Minho |
| Idioma: | inglês |
| Origem: | RepositóriUM - Universidade do Minho |
| Resumo: | This paper aims to describe the Sequential Excavation Method, used for excava-tion in underground works, as well as the related risks and preventive measures. This method has characteristics that differentiate it from other tunnelling techniques: it uses a larger number of workers and equipment; it has a high concurrency of tasks with various workers and equip-ment quite exposed to hazards; and it uses many potentially aggressive chemicals. Firstly, it is given a broad overview of this issue. Afterwards, it will be presented the results of a survey to a sample of experienced technicians, aimed at gauging the relevance of a set of guidelines relat-ing to the design and work phases, applicable to the domestic market and prepared following technical visits to works abroad. |
|---|